Industrial | Price | Unique Features |
C.R Bard Company | $$ | Plumbing for sterilization expansion. |
CSX Tilford Yard | $ | Refurbishment Improvements Oil Water Separator |
Daewoo Machinery | $ | Plumbing |
DNP Warehouse | $ | HVAC & Plumbing |
Fed Ex Ground | Kennesaw | $ | Plumbing |
Habasit Belting | $ | Interior Plumbing & Roof Drains |
Hoshizaki | $ | Refrigeration System, HVAC & Plumbing |
Kawasaki | Warehouse | $ | HVAC & Plumbing |
Kubota | New Tractor Plant | $$ | Compressed Air, Natural Gas, Transmission Oil and Treated Water Piping |
Makita Corporation of America | $ | Design-Build HVAC modifications & renovations |
Mizuno Distribution Center | $ | Plumbing |
Southeastern Mills Plant Conversion | $$ | HVAC & Plumbing |
Southwest | Airline Cargo | $ | HVAC & Plumbing |
Systemax Distribution Center | $ | Interior Plumbing |
Toppan Interamerican Warehouse | $ | HVAC |
Westridge Distribution Center | $ | Design-Build HVAC & Plumbing |
Project 4.0 | $$$ | 750,000 sf – (40) DX RTUs, (75) VAVs w/ Hot Water Reheat coils, (4) Liebert Computer Room Units, (3) HW/DX Split AHUs, (2) Make-Up Air Units, (18) High Volume/Low Speed Fans, (30) Electric Finned Tube Radiation Heaters,(2) HW Pumps, (1) Boiler, (2) Air Compressors, DDC Control System controlling HVAC Equipment, Lighting, Warehouse Shades and Glass Tinting and Monitoring Generators and Water Heaters, (51) Water Closets, (27) Urinals, (61) Lavatories. All plumbing fixtures with w/ sensor flush valves/faucets. We were the BIM lead contractor responsible for facilitating and coordinating with all trades to develop a 100% BIM coordinated set of Drawings. |