Project 4.0

Project 4.0

Tebarco installed the HVAC and Plumbing system in Project 4.0’s new global distribution center in Douglasville, Georgia. This 750,000 square foot project was one of our most exciting and challenging projects. Helicopters were used to hoist the HVAC units onto the top of the building. We installed (40) DX RTUs, (75) VAVs w/ Hot Water Reheat coils, (4) Liebert Computer Room Units, (3) HW/DX Split AHUs, (2) Make-Up Air Units, (18) High Volume/Low Speed Fans, (30) Electric Finned Tube Radiation Heaters,(2) HW Pumps, (1) Boiler, (2) Air Compressors, DDC Control System controlling HVAC Equipment, Lighting, Warehouse Shades and Glass Tinting and Monitoring Generators and Water Heaters, (51) Water Closets, (27) Urinals, (61) Lavatories. All plumbing fixtures with w/ sensor flush valves/faucets. Try saying all that without taking a breath!

We were the BIM lead contractor responsible for facilitating and coordinating with all trades to develop a 100% BIM coordinated set of Drawings. Thanks to Project Manager, Martin Hartsfield and his team, this project was completed on time.